**City Commission & CRA Meeting Agendas | CLICK HERE**
Gaines Park Community Center Community Design Forum

The City of West Palm Beach Department of Parks and Recreation and Department of Engineering will present the latest design for the expansion and renovations of the Gaines Park Community Center.

Learn More
Mayor James Welcomes 30 Student Interns to City Hall

Students Gain Experience, Education through Summer Program.

Learn More
ROAD & DOCK CLOSURES UPDATE: WEEK OF DECEMBER 9, 2018
City of West Palm Beach Road and Dock Closure Updates are issued weekly by the City
CITY OF WEST PALM BEACH CLOSURESENGINEERING
  • Spruce Ave. between 27th and 28th St. (through Friday, December 14th, 2018): West side of Spruce Ave. will be closed for curb, sidewalk and driveway replacement. Flaggers will assist motorists within the work zone. 
  • Spruce Ave. and 31st St. (through January 4, 2019): The intersection will be closed for streetscape and beautification upgrades. The intersection will be open to motorists and pedestrians for the December 16th holiday event.
  • 100 & 200 block of Gregory Rd. (through January 4, 2019) for road improvements. Slower traffic in construction areas. Gregory Rd. remains accessible.
  • Flagler Dr. sidewalk from south of Greenwood Dr. to Monroe Dr. (until further notice): East sidewalk near seawall closed for safety repairs. Flagler Dr. west side sidewalk between Greenwood Dr. and Monroe Dr. remains accessible.
  • Hampton Rd. between Merrill Ave. and Parker Ave. (through May 2019) is closed from Merrill Ave. to Parker Ave. for installation of new wastewater system and pavement restoration.
  • Cumberland Dr. between Military Tr. and Village Blvd. (through January 2019): Reduced speeds on the eastbound and westbound lanes for a road beautification and safety project. Flaggers will assist motorists. Paving overlay continues through December.
  • Georgia Ave. between Briggs St. and Dobbins St. (until further notice): Closed for road improvements. Local traffic only.  Eastbound traffic on Briggs St. may turn right only at Georgia Ave.
 
EVENT CLOSURES
  • Clematis by Night (December 13, 2018, 6:00 p.m. - 9:00 p.m.): Road closures at Clematis St. between Narcissus St. and Banyan Blvd., Flagler Dr. between Banyan Blvd. and Lakeview Ave.
  • GreenMarket (Saturday, December 15, 2018, 6:00 a.m. - 3:00 p.m.): Road closures on Clematis St. between Narcissus Ave. and Flagler Dr.; Narcissus Ave. between Banyan Blvd. and Clematis St.; Lantana Ave. between Banyan Blvd. and Clematis St.
  • 300 block of Clematis St. (Saturday, December 15, 2018, 6:00 a.m. – 4:00 p.m.): Closed for West Palm Beach Antique Flea & Craft Market.
 
CLOSURES, REPAIRS FOR CURRIE PARK BOAT RAMPS
  • Full closure: All Currie Park boat ramps at 2400 Flagler Drive are closed for repairs. Reopening date rescheduled for late January 2019. Ramps will not be accessible during the construction period. Currie Park will remain open from sunrise to sunset
 
CITYPLACE ROAD CLOSURES
  • Rosemary Ave. between Okeechobee Blvd. and Hibiscus St. (through Friday, April 12, 2019):
Full closure by CityPlace for CityPlace streetscape improvements. Access to all parking garages will be maintained. Pedestrian traffic will be unaffected.
  • Hibiscus St. between Rosemary Ave. and Quadrille Blvd. (through Saturday, February 23, 2019): Full closure by CityPlace for CityPlace streetscape improvements. Access to all parking garages from Quadrille Blvd. will be maintained. Pedestrian traffic will be unaffected.
  • For more information: https://www.futureofcityplace.com/.
 
PALM BEACH COUNTY (PBC) ENGINEERING & PUBLIC WORKS CLOSURES IN CITY OF WPB
  • Church St./Old Okeechobee Rd. from Okeechobee Blvd. to N. Florida Mango Rd. (until further notice): Periodic lane closures with flaggers controlling traffic for pavement markings.
  • Australian Ave. and Palm Beach Lakes Blvd. (until further notice): Intersection improvements. Periodic lane closures.
  • Jog Rd. north of 45th St. and west of Florida’s Turnpike (until further notice): Periodic
Southbound lane closures with flaggers controlling traffic for FPL pole replacement.
  • For more information, contact PBC Engineering & Public Works: (561) 684-4000 or
http://discover.pbcgov.org/.
 
FLORIDA DEPT OF TRANSPORTATION (FDOT) CLOSURES IN CITY OF WPB
  • Flagler Memorial Bridge between City of West Palm Beach and Town of Palm Beach (9:00 a.m. – 4:00 p.m., Mondays only through January 2019) will have the outside eastbound lane and the south sidewalk closed for handrail replacement.
  • Military Tr. between 45th St. and Shiloh Dr. (9:00 a.m.-3:30 p.m., Monday through Friday, through Friday, Mar. 8, 2019) will have one northbound lane closed for FPL maintenance operations.
  • Okeechobee Blvd, from N. Florida Mango Rd. to Palm Beach Lakes Blvd. (9:00 a.m. - 3:30 p.m., Monday through Friday, through December) will have one westbound lane and sidewalk closed for directional boring operations.
  • 45th St. and Australian Ave. at the SFRTA Railroad tracks, and Australian Ave. and Mangonia Dr. (9:00 a.m.-3:30 p.m., Monday through Friday, through December 31, 2018) may have intermittent outside lane closures in each direction for FPL pole replacement.
  • US 1/S. Dixie Hwy. from Cranesnest Wy. to Jefferson Rd. (9:00 a.m. - 3:30 p.m., and nightly, 7:00 p.m.- 5:00 a.m., Sunday night through Friday, through December 14, 2018) may have intermittent northbound lane and shoulder closures, daily, for water main removal, drainage and curb installation, and paving operations.
 
City of West Palm Beach Road and Dock Closure Updates are issued weekly by the City and may be viewed online at http://wpb.org/News-Video/Road-Closure-Updates.