**City Commission & CRA Meeting Agendas | CLICK HERE**
**“Public Utilities Customer Service will be closed on Friday, December 14, 2018 between the hours of 11:00 am - 1:30 pm**
**We apologize for any inconvenience this may cause**
ROAD & DOCK CLOSURES UPDATE: WEEK OF DECEMBER 16, 2018

City of West Palm Beach Road and Dock Closure Updates are issued weekly by the City

Learn More
RIBBON CUTTING CEREMONY TO CELEBRATE HISTORIC PEPPERS HOUSE RENOVATIONS

Event to highlight City's commitment to attracting homeownership and preservation of historic structures.

Learn More
ROAD & DOCK CLOSURES UPDATE: WEEK OF NOVEMBER 18, 2018
City of West Palm Beach Road and Dock Closure Updates are issued weekly.
CITY OF WEST PALM BEACH CLOSURES
ENGINEERING
  • Spruce Ave. between 29th and 28th  St. (through Wednesday, November 21, 2018): East side of Spruce Ave. will be closed alternately for curb, sidewalk and driveway replacement. Flaggers will assist motorists within the work zone.
  • Gregory Rd. (100 & 200 block through mid-December) for road improvements. Slower traffic in construction areas. Road remains accessible.
  • Flagler Dr. sidewalk from south of Greenwood Dr. to Monroe Dr. (until further notice): East sidewalk near seawall closed for safety repairs. Flagler Dr. west side sidewalk between Greenwood Dr. and Monroe Dr. remains accessible.
  • Hampton Rd. between Merrill Ave. and Parker Ave. (through May 2019) is closed from Merrill Ave. to Parker Ave. for installation of new wastewater system and pavement restoration.
  • Cumberland Dr. between Military Tr. and Village Blvd. (through January 2019): Reduced speeds on the eastbound and westbound lanes for a road beautification and safety project. Flaggers will assist motorists. Paving work  Monday, November 19, 2018 through Wednesday, November 21, 2018.
  • Georgia Ave. between Briggs St. and Dobbins St. (until further notice): Closed for road improvements. Local traffic only.  Eastbound traffic on Briggs St. may turn right only at Georgia Ave.
 
CITYPLACE ROAD CLOSURES
  • Rosemary Ave. between Okeechobee Blvd. and Hibiscus St. (through Friday, April 12, 2019):
Full closure for CityPlace streetscape improvements. Access to all parking garages will be maintained. Pedestrian traffic will be unaffected.
  • Hibiscus St. between Rosemary Ave. and Quadrille Blvd. (through Saturday, February 23, 2019): Full closure for CityPlace streetscape improvements. Access to all parking garages from Quadrille Blvd. will be maintained. Pedestrian traffic will be unaffected.  For more information: https://www.futureofcityplace.com/
 
EVENT CLOSURES
  • Greenmarket (Saturday, November 24, 2018, 6:00 a.m. - 3:00 p.m.): Road closures on N. & S. Clematis St. between Narcissus Ave. and Flagler Dr., Narcissus Ave. between Banyan Blvd. and Clematis St., Lantana Ave. between Banyan Blvd. and N. Clematis St.
  • 300 block of Clematis. (Saturday, November 24, 2018, 8:30 a.m.-2:30 p.m.): Closed for West Palm Beach Antique Flea & Craft Market.
 
CLOSURES, REPAIRS FOR CURRIE PARK BOAT RAMPS
  • Full closure: All Currie Park boat ramps at 2400 Flagler Drive are closed for repairs. Reopening date rescheduled for Spring 2019. Ramps will not be accessible during the construction period. Currie Park will remain open from sunrise to sunset.
 
PALM BEACH COUNTY (PBC) ENGINEERING & PUBLIC WORKS CLOSURES IN CITY OF WPB
  • Australian Ave. and Palm Beach Lakes Blvd. (until further notice): Intersection improvements. Periodic lane closures.
  • Jog Rd., north of 45th St., and west of Florida’s Turnpike (until further notice): Periodic southbound lane closures with flaggers controlling traffic for FPL pole replacement.
  • Roebuck Rd. from Jog Rd. to Haverhill Rd. (periodic lane closures until further notice): Alternating traffic with flaggers controlling traffic for road construction.
  • For more information, contact PBC Engineering & Public Works: (561) 684-4000 or http://discover.pbcgov.org/.
 
FLORIDA DEPT OF TRANSPORTATION (FDOT) CLOSURES IN CITY OF WPB
  • Okeechobee Blvd. at I-95 (Sunday, November 18, 2018 through Wednesday, November 21, 2018) may have intermittent lane closures in each direction, 9 p.m. until 5 a.m. for bridge repairs.
  • Okeechobee Blvd. at Seminole Blvd. (through Tuesday, November 20, 2018) may have one lane and/or turn lane closed in each direction, 9 a.m. until 3 p.m., Monday through Friday, for median modification and paving operations.
  • US 1/S. Dixie Hwy. from Cranesnest Way to Jefferson Rd. (through Friday, December 14, 2018) may have intermittent northbound lane and shoulder closures, daily, 9 a.m. until 3:30 p.m., and nightly, 7 p.m. until 5 a.m., Sunday night through Friday for water main removal, drainage and curb installation, and paving operations.
  • Belvedere Rd., just east of Mercer Ave. at the railroad tracks. (through Friday, November 30, 2018): Two westbound lanes will be closed, 9 p.m. until 5 a.m., Monday night through Friday morning for pole replacement operations. Please note, there will be no work from Nov. 21 – Nov. 25.
  • For more information, contact FDOT: (866) 336-8435 or http://www.fdot.gov/
 
City of West Palm Beach Road and Dock Closure Updates are issued weekly by the City and may be viewed online at http://wpb.org/News-Video/Road-Closure-Updates.